Construction accounting software priced for the US and Canada

As of November 2026, compare construction accounting software for 20 to 100 person contractors: published prices, job costing, and where QuickBooks stops.

Both platformsERP Fundamentals20 min readUpdated 29 sources

Key takeaways

  • Write the four numbers you will reconcile every month: cost codes, committed cost, cost to complete, change orders. Add WIP, the billing form, and retainage or holdback as required or optional.
  • This page is for owners, finance leads, and operations managers at general contractors and larger specialty firms in the US and Canada.
  • Page-one roundups mix subcontractors, large-company ERPs, and products with no price.
  • QuickBooks stops in two places that Intuit prints on its own pages: how many users the plan allows, and which job-cost reports the Contractor edition adds on Desktop.

Which construction accounting software fits a 20 to 100 person contractor

This page is for owners, finance leads, and operations managers at general contractors and larger specialty firms in the US and Canada. The buying question is which construction accounting software still fits once a handful of crews and simple projects are no longer the whole business, and when a construction ERP is the better buy.

Stay on QuickBooks Online while headcount in the books stays inside the published user cap and the jobs do not need a committed-cost report, retainage or holdback on both sides of the ledger, or AIA-style progress bills. As of November 2026, Online Plus is 5 users and Online Advanced is 25 users. Desktop Enterprise Diamond goes to 40 users and adds a committed-costs-by-job report, change-order management, and a work-in-progress report on the Contractor edition.

Move to a construction accounting product when those contractor documents are weekly work. Sage 100 Contractor and FOUNDATION publish no dollar price, so both are by quote. Acumatica Construction Edition prices by consumption, and its APEX for Construction bundle is advertised with a starting price under USD 1,500. Move to an ERP when the same company also needs purchasing, inventory, and multi-entity finance on the ledger: Business Central Essentials is USD 80 per user a month, or CAD 108.50 in Canada, and construction retainage or AIA billing is an add-on quote. Odoo lists Standard at USD 24.90 per user a month for the first 12 months on the initial users ordered, then USD 31.10, with construction variations in the industry app and implementation priced separately. A wider ERP shortlist sits in ERP for construction companies.

Construction accounting software shortlist, with published prices

Page-one roundups mix subcontractors, large-company ERPs, and products with no price. The table below is sized for a contractor of about 20 to 100 people. Each row uses the vendor's own page as of November 2026. Promotional prices expire, and Microsoft says checkout can differ by currency, country, and region.

Read the limit column before the price. A low monthly fee with a 5-user cap is a different purchase from a per-user ERP, and a quote-only product can still be the right ledger if your bonding agent reads a WIP schedule every month.

Construction accounting software for a 20 to 100 person contractor, as of November 2026.
ProductWho it fitsWhat it does wellLimitPublished price, November 2026
QuickBooks Online PlusA small contractor book with a few people in the file and project profitability to watchTrack project profitability. Canada includes up to 40 classes and locations.5 users plus 2 accountants on the US plan. Up to 5 users in Canada.US list USD 140 per month (shown at USD 70 for the first 3 months). Canada list CAD 110 per month (shown at CAD 11 for 6 months).
QuickBooks Online AdvancedA contractor that has outgrown Plus and still wants Online, up to the mid-20s in the fileConstruction financials solution and advanced project financials on the US feature list. Canada: unlimited classes and locations.25 users plus 3 accountants in the US. Up to 25 users in Canada. Intuit's FAQ also points Desktop Enterprise to 40 users, and describes Intuit Enterprise Suite for multi-entity heavy project costing, with no Suite price on the page.US list USD 340 per month (shown at USD 170 for the first 3 months). Canada list CAD 220 per month (shown at CAD 22 for 6 months). US paid plans: no annual contract, cancel anytime.
QuickBooks Desktop Enterprise ContractorA contractor that needs QuickBooks job costing past the Online user cap, including a committed-cost reportIndustry edition adds construction reports and a construction chart of accounts. Job costing page lists change-order management, a committed-costs-by-job report, a WIP report, and employee time tracking.Gold and Platinum: 1 to 30 users. Diamond: up to 40 users, monthly plan only. Cloud hosting is extra. No separate Contractor price is published.Starting price shown at USD 19 per month, with USD 38 struck through. Gold and Platinum are on an annual subscription. Diamond is monthly only. Intuit's US pricing page shows no CAD Enterprise price.
Sage 100 ContractorA general contractor whose close depends on job cost, certified payroll, AIA billings, and lien waiversJob cost and project detail, dashboards, and estimating that can export budgets, proposals, subcontracts, and purchase orders. The page names certified payroll, AIA billings, and lien waivers.US product page publishes no dollar price and no CAD price.Pricing is by quote as of November 2026.
FOUNDATIONA contractor that wants job cost, payroll, purchase orders, and subcontracts in a construction ledgerBudgets by custom cost codes or CSI divisions, estimated versus actual cost, hours, and quantities, change orders by status, and WIP and over/under billing reports. Included modules include job costing, payroll, purchase orders and subcontracts, and accounts receivable.Pricing is custom by module. The job costing page does not name a committed-cost report, so ask for that column in a demo.Pricing is by quote as of November 2026. No dollar amount on the pricing page.
Acumatica Construction EditionA contractor that expects many named people in the system and wants commitments and change orders in a cloud ERPBudgets, commitments, change orders, and progress billing. Consumption pricing uses applications, transaction volume, and computing resources rather than a fee for every named user.The public calculator collects a quote request. No CAD price is published.Outside APEX, pricing is by quote. APEX for Construction, a bundle of software, implementation, and support, has a starting price under USD 1,500.
Business Central with construction add-onsA contractor already on Microsoft 365 that wants projects, purchasing, and a general ledger, then construction billing on topProjects cover budgets versus actual item and resource usage, time sheets, purchase orders for supplies, WIP posted before invoicing, and invoicing at completion or on a schedule.Microsoft's project overview does not describe construction retainage, holdback, or AIA billing, so those are add-on quotes. Microsoft's pricing page lists no add-on prices.Essentials USD 80 per user a month, Premium USD 110, Team Members USD 8, paid yearly. Canada: Essentials CAD 108.50, Premium CAD 149.20, Team Members CAD 10.90, per user a month, paid yearly, plus applicable tax.
OdooA contractor that wants estimating, purchasing, and job cost on one database and will scope construction billing in implementationThe general-contractor page tracks supplier costs against estimates, compares estimated and actual hours, supports progress increments for billing, and manages main contracts and variations.Odoo publishes no construction-specific license price, and Odoo.sh hosting is extra. Standard profitability documentation shows purchase-order cost after the vendor bill posts, so committed cost needs a defined report.US view: Standard USD 24.90 per user a month for the first 12 months on the initial users ordered, then USD 31.10. Custom from USD 49.00. No CAD list on the pricing page, so ask for a CAD quote.

Where QuickBooks stops for a contractor past 20 people

QuickBooks stops in two places that Intuit prints on its own pages: how many users the plan allows, and which job-cost reports the Contractor edition adds on Desktop. It does not stop at an arbitrary company size. A 20-person firm can still fit Online Advanced. A 40-person firm cannot, if more than 25 people need Online access.

Worked example, US list prices as of November 2026, before promotions. Eight people who need the books miss Online Plus, because Plus is 5 users plus 2 accountants. The same firm moves to Online Advanced at USD 340 a month, which includes 25 users plus 3 accountants. The first 3 months on Advanced are shown at half price, USD 170, and the US page says paid plans have no annual contract.

The same headcount in Canada, list prices before the 90 percent promotion: Plus at CAD 110 a month with up to 5 users, Advanced at CAD 220 a month with up to 25 users. The page shows the promotional rates as CAD 11 and CAD 22 a month for 6 months. Plus includes project profitability and up to 40 classes and locations. Advanced includes unlimited classes and locations.

A second worked example: 32 people need access, and the controller wants committed cost before the vendor bill arrives. Those 32 users miss Online Advanced, which stops at 25 users, and they miss Desktop Enterprise Gold and Platinum, which cover 1 to 30 users. Diamond, up to 40 users on a monthly plan, is the QuickBooks plan that still fits, and the committed-costs-by-job report is on the Contractor job-costing page. The pricing page shows a starting price of USD 19 a month with USD 38 struck through. That figure is a starting price for Enterprise, not a published Contractor-only price, and cloud hosting is extra. Intuit's US page shows no CAD Enterprise price.

Depth is the other stop. Intuit describes Desktop Enterprise Contractor as the industry edition with the same key features as standard Enterprise plus construction reports and a construction chart of accounts, and points to it for job costing. The job-costing page lists change-order management, a committed-costs-by-job report, a work-in-progress report, and employee time tracking. The Online Advanced pricing page names a construction financials solution and advanced project financials. It does not itemize retainage, AIA billing, or a committed-cost report, so treat those as unconfirmed on Online until you see them on your file.

Intuit's pricing FAQ says Online Advanced supports up to 25 users and Desktop Enterprise can scale up to 40. The same FAQ describes Intuit Enterprise Suite as an ERP for multi-entity organizations that need heavy project costing for construction or service work, and it publishes no Suite price. Bookkeeping software for contractors can stay on QuickBooks through that 25-user Online line. General contractor accounting software usually leaves once subcontracts, owner retainage, and a WIP schedule are all month-end tasks.

What job costing software has to do on a live job

Job costing software is the part of construction accounting software that answers a single question while the job is open: what will this job cost when it is finished, and how does that compare with the contract. Accounting and job costing software that only shows bills already posted answers a different question, and it answers it too late for a superintendent to change crew or buying plans.

Four numbers do that work. Cost codes (or CSI divisions) are the budget lines: labor, material, subcontract, equipment. Committed cost is actual cost already posted plus open purchase orders and signed subcontracts that are not billed yet. Cost to complete is what you still expect to spend to finish the job. A change order revises the contract, the budget, or both, and it should keep the original contract amount visible. A free construction change order form can price each change with markups and tax and keep the log for the job before your accounting software records it. WIP then compares earned revenue with what you have billed, which is where overbilling and underbilling come from.

Worked example with the assumptions stated up front. Original contract USD 2,000,000. Original cost budget USD 1,700,000. Costs posted to the ledger USD 850,000. Open subcontracts and purchase orders not yet billed USD 400,000. One approved change order adds USD 80,000 to the contract and USD 60,000 to the budget. Revised contract is USD 2,080,000. Revised budget is USD 1,760,000. Committed cost is USD 1,250,000 (850,000 posted plus 400,000 still open). If the rest of the revised budget is still a fair forecast, cost to complete is USD 510,000 (1,760,000 minus 1,250,000) and the forecast final cost equals the revised budget. The share of that revised budget already committed is 1,250,000 divided by 1,760,000, about 71 percent. Percent complete on posted cost alone is a different ratio, 850,000 divided by 1,760,000, about 48 percent, and it leaves the open commitments out. If those open commitments were left out of the forecast, the job would look USD 400,000 healthier than the paper the company has already signed.

Vendor pages name these pieces differently, as of November 2026. QuickBooks Desktop Enterprise job costing lists change-order management, a committed-costs-by-job report, and a WIP report. FOUNDATION lets you budget with custom cost codes or CSI divisions, compare estimated and actual cost, hours, and quantities, and track change orders by status so an approved change updates budget detail and leaves the original contract amount intact. The same FOUNDATION page describes WIP and over/under billing. It does not use the words committed cost. Sage 100 Contractor describes job cost and project detail, and estimating that can export budgets, proposals, subcontracts, and purchase orders. Acumatica says Construction Edition supports budgets, commitments, change orders, and progress billing. Odoo's general-contractor page compares supplier costs with estimates and estimated hours with actual hours, and manages variations. Odoo's project profitability documentation still shows purchase-order cost only after the vendor bill is posted, so a committed-cost view is a report you specify. Business Central documents budgets versus actual usage, purchase of supplies on purchase orders, and WIP. It does not document a construction committed-cost column.

What a contractor needs from the system

Start from the contract and the month-end close. The table lists the capabilities that separate a construction ledger from a general one, and a question that shows whether the product does the work or only stores a code.

Ask for the committed-cost column on a live job before you compare screenshots of posted bills. A signed subcontract is a cost the job has already taken on. If that number waits for the vendor bill, the forecast the owner sees on Thursday is already stale.

Construction capabilities and the question that exposes a gap.
CapabilityWhat it meansQuestion to ask in the demo
Job costing by cost codeLabor, material, subcontract, and equipment cost against a budget lineCan I see budget, committed, and actual by cost code for one job on one screen?
Committed costOpen subcontracts and purchase orders count against the job before the bill arrivesDoes an unbilled subcontract change the job's forecast cost today?
Cost to completeThe remaining spend you still expect, so forecast final cost is committed cost plus that remainder, or your own forecast if the budget is staleWho updates cost to complete, and does the WIP report use that figure?
Change ordersAn approved change revises budget or contract and leaves the original contract visibleShow an approved change that adds to the contract and a different amount to the cost budget.
WIP scheduleEarned revenue, overbilling, and underbilling by job, posted to the ledgerWhich recognition methods ship, and who can change the method after posting?
Progress billingBills tied to percent complete or a schedule of values, including AIA-style applications where the owner requires themCan I bill a percentage of a contract line and see what remains?
Retainage or holdbackAmount withheld on customer bills and on subcontractor bills, then released on a rule you can point toIs the hold tracked on both receivables and payables, with a release step?
Subcontractor complianceInsurance, license, and lien waiver records that block or warn on paymentDoes an expired certificate stop a payment, or only show a warning?
Certified payrollWeekly payroll data for prevailing wage and public workDoes the product produce the file, or does a payroll service?

What general contractor accounting software has to carry

General contractor accounting software has a harder ledger than a single-trade book, because the general contractor sits between the owner and a stack of subcontractors on the same job. The same cost code can hold your own labor, a subcontract you have committed, a change the owner approved, and a change you have not yet passed to the sub.

Four jobs show up on general-contractor buys more often than on a specialty trade that self-performs most of the work. You withhold retainage or holdback from subcontractors and the owner withholds it from you, on the same job, and the two balances are not the same number. You bill the owner on a schedule of values, and Sage 100 Contractor is one product that names AIA billings on its own page. You need committed cost on subcontracts, as well as on purchase orders for materials you buy yourself. And a change order has more than one party: the owner, you, and at least one sub.

Specialty trades still need cost codes, payroll, and a way to see a job go over budget. Certified payroll and lien waivers matter as soon as the work is public or the general contractor requires waivers before payment. Sage 100 Contractor's page puts certified payroll, AIA billings, and lien waivers next to job cost, which is the general-contractor set. A trade contractor with short jobs and few subs may never open those screens, and QuickBooks project tracking can cover them longer.

Home builders searching for accounting software are closer to the general-contractor pattern when each house is a job with a budget, draw billing, and buyer change orders. They are closer to a specialty book when one crew self-performs and the draw schedule is simple. Use the same four tests: cost codes, committed cost, change orders, and the billing form the lender or owner accepts.

Four kinds of software that get called construction software

People search for construction accounting software and land on four product types. Naming the type before the demo saves a cycle.

General small-business accounting, led by QuickBooks Online, tracks project profitability and, on Advanced in the US, lists construction financials. It fits while user counts stay inside the plan and the close does not depend on a committed-cost report. Desktop Enterprise Contractor is still QuickBooks, with the job-cost reports called out above, up to 40 users on Diamond.

Construction accounting specialists are built around the contractor close. Sage 100 Contractor and FOUNDATION are the two in this shortlist with public construction workflows and quote-only pricing. Sage Intacct Construction also appears on many buyer shortlists. Ask Sage for a current quote, the user model and the construction module list before you compare it with the products here.

Construction ERP editions put a construction layer on a broader cloud ERP. Acumatica Construction Edition is the one here: commitments and change orders, consumption pricing rather than a named-user fee, and an APEX bundle advertised under USD 1,500 that includes implementation. That bundle is not a per-user price you can line up against Business Central.

General ERP with construction capability is Business Central or Odoo. Both run the ledger, purchasing, and projects. Construction retainage, holdback, and AIA forms are the gap you price on top. Project tools such as Procore run drawings, RFIs, submittals, and field work, price by annual construction volume with unlimited users, and do not list a general ledger on the pricing page. If month-end is the pain, start with the ledger. The boundary with field software is covered in Odoo vs Procore for general contractors.

Where Sage 100 Contractor, FOUNDATION, and Acumatica fit

Pick a construction specialist when the month-end pack is the product: job cost, a WIP schedule, progress billing the owner will accept, and payroll or lien paperwork on public work. That depth is the reason these products exist. The trade-off is a narrower fit if you also run a fabrication shop, a service division, or a wholesale counter and want those on the same ledger.

Sage 100 Contractor, as of November 2026, describes job cost and project detail, customizable dashboards, and integrated estimating that can export budgets, proposals, subcontracts, and purchase orders. It names certified payroll, AIA billings, and lien waivers as tasks the product can manage. The US product page publishes no price. The page shows no Canadian price either, so treat Canada as quote-only too. The page is written for contractors who need job cost while the work is underway, which is the same test as the worked example above.

FOUNDATION says pricing is custom by the modules a contractor needs. Modules included with the software include job costing, payroll, purchase orders and subcontracts, and accounts receivable. Add-ons named on the pricing page include mobile time tracking, service dispatch, equipment management, and project management. Job costing supports custom cost codes or CSI divisions, estimated versus actual cost, hours, and quantities, change orders that update the budget and preserve the original contract, and WIP and over/under billing reports. Ask them to show committed cost. Do not assume the report exists because the rest of the job-cost set is strong.

Acumatica prices Construction Edition on consumption: applications, transaction volume, and computing resources, not a license fee for every named user. The product page says it supports budgets, commitments, change orders, and progress billing. APEX for Construction bundles software, implementation, and support with a starting price under USD 1,500. A configured price sits behind the vendor quote form. No CAD list price is published on the construction page. If you need many field logins, the consumption model is the commercial point. Compare the quote with Business Central's per-user list, and keep implementation inside the APEX figure only for that bundle.

Business Central as construction accounting software

Business Central is the ERP path when the company wants one ledger for finance, purchasing, and projects, and construction billing can be added with a clear scope. As of November 2026, Essentials lists at USD 80 per user a month and Premium at USD 110, paid yearly. Team Members lists at USD 8. In Canada the same licenses are CAD 108.50, CAD 149.20, and CAD 10.90 per user a month, paid yearly, plus applicable tax. Microsoft says the prices shown may differ at checkout because of currency, country, and region.

A 15-user worked example, full users only, yearly billing, before tax. United States Essentials is 15 times USD 80, or USD 1,200 a month. Canada Essentials is 15 times CAD 108.50, or CAD 1,627.50 a month, plus tax. People who only approve or read can sit on Team Members at USD 8 or CAD 10.90. This is license math, not an implementation fee. Microsoft's page does not price construction add-ons for retainage, holdback, or AIA billing.

Microsoft's project documentation covers budgets versus actual item and resource usage, time sheets, purchase of supplies on purchase orders, WIP so expenses can post before you invoice, and invoicing when the project finishes or on a schedule. Separate WIP articles still describe five methods: Cost Value, Cost of Sales, Sales Value, Percentage of Completion, and Completed Contract. Percentage of Completion uses actual total cost divided by budget total cost, so a stale budget produces a wrong profit figure. A batch job calculates WIP, and a separate step posts it to the general ledger. None of that overview describes construction retainage, holdback, or AIA billing.

That gap is why the shortlist says Business Central with construction add-ons. Construction retainage and AIA billing come from add-on publishers by quote, and Microsoft's pricing page lists no add-on prices. The Business Central jobs and projects guide walks through the core project setup, and ERP for contractors stays on the US job-cost close.

Choose Business Central when Microsoft 365 is already the company standard, you want dimensions and a controller-friendly ledger, and you accept a construction layer on top of projects. Choose it over QuickBooks when you are past 25 Online users, you need purchase orders and inventory in the same database, or you are heading for more than one legal entity. The license is per user. A field-heavy company should price Team Members against full users before assuming every superintendent needs Essentials.

Odoo for construction accounting and job costing

Odoo fits a contractor that wants job cost, purchasing, and billing records on one database and will pay for implementation of the construction layer. The public pricing page, as shown to a US visitor in November 2026, lists Standard at USD 24.90 per user a month for the first 12 months on the initial users ordered, then USD 31.10, and Custom from USD 49.00. Light users are priced by quote. Hosting on Odoo.sh is not included. The page shows no CAD price, so a Canadian contractor should ask for a CAD quote rather than convert the US rate.

On a 15-user calculation, Standard is USD 373.50 a month (15 x 24.90) for the first 12 months, then USD 466.50 a month (15 x 31.10). Light users are the closer comparison to a Team Member seat, and Odoo quotes them. Implementation is separate from the license.

The general-contractor industry page says the construction toolkit tracks supplier costs against estimates, compares estimated and actual hours, supports progress increments for billing, and manages main contracts and variations. It does not publish a construction-specific license. For the accounting detail, analytic plans group accounts by project, and the distribution is set on each invoice or bill so a vendor bill can split across jobs. Project profitability reads timesheets, purchase orders, stock moves, and customer invoices. The same profitability page states that a purchase order cost appears once the vendor bill is posted. A signed subcontract that has not been billed stays out of that view until you add a report on purchase-order lines. Price that report at the start if committed cost is one of your four numbers.

Staged billing in core Odoo uses percentage or fixed down payments and milestone invoicing. Marking a milestone reached updates the delivered quantity, and you invoice that share. Retention, holdback, and AIA forms are not described in core Odoo invoicing. Any third-party app price has to be read from that vendor's current listing, and you still test retainage on both the customer bill and the subcontract before you rely on it.

Odoo is the lower license line next to Business Central's per-user dollar price, and it is the ERP to scope when you want estimating, inventory, and projects configured around your cost codes. It is a poor impulse buy if you need certified AIA output next month and you have not seen the form produced from your schedule of values. Our Odoo project billing guide covers milestones and down payments. The package path for contractors is below.

How the lanes compare on the jobs that matter

Use this as a reading of public pages as of November 2026, next to the price table above. A feature that exists can still be awkward on your cost-code structure, so the demo is still one live contract.

What each lane documents publicly, November 2026.
JobQuickBooksSage 100 Contractor or FOUNDATIONBusiness Central or Odoo
Job cost by cost codeOnline: project profitability. Desktop Contractor: construction reports and chart of accounts.Sage 100: job cost and project detail. FOUNDATION: custom cost codes or CSI divisions.Business Central: project budgets versus actual usage. Odoo: analytic accounts and estimate versus actual on the construction page.
Committed costDesktop job costing lists a committed-costs-by-job report. Online Advanced does not itemize that report on the pricing page.FOUNDATION's job-cost page does not name committed cost. Ask Sage 100 to show open subcontracts in the forecast.Acumatica names commitments. Odoo profitability shows purchase-order cost after the vendor bill posts. Business Central documents purchase orders and budgets, not a construction commitment column.
Change ordersDesktop job costing lists change-order management.FOUNDATION tracks change orders by status and keeps the original contract amount.Odoo's construction page manages main contracts and variations. Business Central project docs do not describe multi-party construction change orders.
WIP and cost to completeDesktop lists a WIP report. You still maintain the forecast.FOUNDATION lists WIP and over/under billing. Sage 100 is quote-only on the report pack.Business Central has five WIP methods and a post-to-ledger step. Odoo WIP is a report or configuration you specify.
Progress billing and AIANot itemized on the Online Advanced pricing page.Sage 100 names AIA billings. Confirm FOUNDATION on your form.Business Central project overview does not describe AIA billing. Odoo core covers milestones and down payments. AIA or certificates need an app or a build.
Retainage and holdbackNot itemized on the Online pages cited here. Confirm on your file.Ask each vendor to show owner and sub balances on one job. Ontario holdback is a legal rule, not a feature name.Business Central retainage and AIA billing are add-on quotes, and Microsoft's pricing page lists no add-on prices. Retention, holdback, and AIA forms are not described in core Odoo invoicing. Any third-party app price has to be read from that vendor's current listing.
Users and price shapeOnline Plus 5 users, Advanced 25, Desktop Diamond 40. Company-level monthly price, plus hosting on Desktop.Quote. No public user fee on the pages checked.Business Central per user per month. Odoo per user, from USD 24.90. Acumatica by consumption, with APEX under USD 1,500 as a bundle starting price.

Retainage, Ontario holdback, and GST/HST

Retainage in the United States is not one private-work rate you can type into every job. The figure that is written down for federal work is in FAR 52.232-5. On federal fixed-price construction contracts, if satisfactory progress has not been made, the contracting officer may retain a maximum of 10 percent of the progress payment until progress is satisfactory. When the work is substantially complete, the officer may keep only what protects the government and must release the rest. Private commercial retainage is whatever the contract and that state's law say. Do not load a national 5 or 10 percent default and call it compliance.

Federal prompt payment is a different clause. FAR 52.232-27 sets a 14-day due date for approved progress-payment requests on federal construction contracts, and the prime pays subcontractors for satisfactory performance no later than 7 days after the prime is paid. The clause also allows a subcontract to retain a specified percentage of each progress payment if the parties agree. Your software has to store the percent from the contract. It should not invent one.

Holdback and prompt payment in Canada are provincial. The figures in this section are Ontario's Construction Act. Ontario defines holdback as 10 percent of the value of the services or materials supplied under a contract or subcontract, the amount Part IV requires the payer to withhold. Prompt payment is subject to that holdback. Under section 6.4, an owner must pay a proper invoice no later than 28 days after receiving it, unless the owner gives a notice of non-payment no later than 14 days after receipt, in the prescribed form, stating the unpaid amount and the reasons. Holdback can still be outstanding while the rest of a proper invoice is due. A proper invoice, in section 6.1, needs the contractor's name and address, the invoice date and the period or milestone, a contract or purchase-order identifier, a description and quantity, the amount payable and the payment terms, and where to send payment. Ask counsel before you use these Ontario settings on a job in another province.

A Canadian worked example, assumptions stated. An Ontario owner receives a proper invoice for CAD 100,000 of work. Holdback at 10 percent is CAD 10,000. The amount the prompt-payment clock applies to, subject to holdback, is the rest of that invoice. If the owner disputes CAD 8,000, the notice of non-payment has to go out within 14 days and name the unpaid amount and the reasons. The software needs a holdback payable and a holdback receivable, a release date you control, and a bill format that can carry the proper-invoice fields. Confirm with your accountant how GST/HST applies to the holdback portion, then test that tax code in the product.

GST/HST follows the place of supply, and you report it for the period that covers the invoice date, whether or not the customer has paid. CRA examples: 13 percent HST when goods are delivered in Ontario, 14 percent HST in Nova Scotia after the 1 April 2025 decrease (provincial portion 9 percent), and 5 percent GST plus Manitoba's 7 percent PST when goods are picked up in Manitoba. A contractor who supplies work in another province has to rate the invoice from the place-of-supply rules, not from the province on the letterhead. Construction accounting software in Canada should let the tax code change by job or by ship-to, and the CAD list prices on this shortlist are QuickBooks Canada and Business Central Canada. Other products on this shortlist are quote-only in Canadian dollars.

Two US payroll and vendor rules still belong in the demo. For payments made in 2026, the IRS threshold for Form 1099-NEC reporting is USD 2,000, with inflation indexing from 2027. On federal or federally assisted construction, covered contractors submit payroll information weekly, within seven days after the regular payment date of the payroll period. The Department of Labor says use of Form WH-347 is optional. The prime contractor is responsible for the certified payrolls of its subcontractors. Sage 100 Contractor and FOUNDATION both put payroll in the product story. Business Central and Odoo usually meet certified payroll through a payroll service or an app. Our Business Central jobs guide notes holdback patterns you will still configure.

What the software costs a 20 to 100 person contractor

Price three lines for three years: licenses, construction add-ons, and implementation. The license figures below are the vendors' own lists as of November 2026. Budget implementation as its own quote.

QuickBooks is a company subscription until you outgrow the user cap. US Plus USD 140 a month, US Advanced USD 340 a month, before the three-month half-price offer. Canada Plus CAD 110 a month and Advanced CAD 220 a month, before the six-month promotion. Desktop Enterprise shows a USD 19 a month starting price against a USD 38 struck-through list, with hosting extra, and Diamond is the plan that reaches 40 users.

Quote-only, as of November 2026: Sage 100 Contractor, FOUNDATION, and Acumatica Construction Edition outside the APEX bundle. Acumatica's published anchor is the APEX for Construction starting price under USD 1,500, covering software, implementation, and support. That is a bundle floor, not a per-user rate, and a configured total can differ once transaction volume is in the quote.

Business Central and Odoo scale with users. Fifteen Essentials users are USD 1,200 a month in the US or CAD 1,627.50 a month in Canada before tax, paid yearly, as calculated above. Fifteen Odoo Standard users are USD 373.50 a month at USD 24.90 in the first year, or USD 466.50 a month at USD 31.10. Add light users or Team Members only for people who do not need a full seat. Construction retainage and AIA billing on Business Central are add-on quotes, and Microsoft's pricing page lists no add-on prices. Retention, holdback, and AIA forms are not described in core Odoo invoicing, and any third-party app price has to be read from that vendor's current listing.

When the license comparison is no longer the decision, the implementation scope is. Flectic's fixed-scope Odoo work for this industry is the construction package in the last section, with a written proposal that prices each phase before work starts. For a wider cost frame, read the ERP implementation cost guide and run the Odoo pricing calculator. License math and that phase price answer different questions. Keep them in separate lines of the budget.

How to choose construction accounting software, and when to move to an ERP

Choose in this order: user cap, the four job-cost numbers, billing and holdback, then whether the rest of the company needs an ERP. Teams that start from demo polish buy depth they never post, or they skip the column that makes the first WIP wrong.

Stay on QuickBooks Online Advanced when you are inside 25 users, project profitability is enough, and you have confirmed on your own file any retainage or committed-cost report you think you need. Move to Desktop Enterprise Contractor when you need the committed-costs-by-job report, change orders, and WIP inside QuickBooks and you are inside 40 users on Diamond. Move to Sage 100 Contractor or FOUNDATION when AIA-style billing, certified payroll, lien waivers, or a specialist WIP pack is the close, and collect a quote. Move to Acumatica when you want commitments and change orders with consumption pricing and you will not force that quote into a fake per-user comparison.

Move to an ERP when QuickBooks is out of users or out of depth and you also need purchasing, inventory, or more than one entity on the same books. Business Central stays on the shortlist as the Microsoft product: projects and WIP in the base product, construction retainage and AIA as an add-on quote, list price USD 80 or CAD 108.50 for Essentials. Odoo is the product when its per-user license and a configured construction layer fit, with variations and estimate-versus-actual on the industry page and committed cost specified in the build. The wider construction ERP choice is in ERP for construction companies. A side-by-side of the two products is in Odoo vs Business Central.

When the fit is Odoo, Flectic's offer for this work is the Odoo Construction package. The discovery call is free. After it, Flectic sends a written proposal with a fixed price for each phase before work starts. Book a free discovery call and bring one live contract.

  • Write the four numbers you will reconcile every month: cost codes, committed cost, cost to complete, change orders. Add WIP, the billing form, and retainage or holdback as required or optional.
  • Give every vendor one real contract: a schedule of values, a subcontract with a withhold percent, and one change order that hits the owner and a sub differently. Run it live.
  • Match the plan to headcount. Plus at 5 users, Advanced at 25, Desktop Diamond at 40, then a per-user or consumption system.
  • In Canada, load an Ontario proper invoice and a 10 percent holdback if you work in Ontario, and a GST/HST code that can change with place of supply. Do not paste Ontario rules onto every province.
  • In the US, type the retainage percent from the contract. Use the federal 10 percent figure only where FAR 52.232-5 applies.
  • Price licenses, add-ons, payroll, and implementation on separate lines for three years. Quote-only vendors stay quote-only until the quote arrives.
  • If the choice is Odoo, open Flectic's Odoo Construction package and book a free discovery call. If the fit is Business Central, Flectic implements Dynamics 365 too, and the Business Central implementation page covers that path. If a specialist already produces your WIP and AIA bills cleanly, stay there.

How Flectic can help

Flectic implements Odoo for contractors of 20 to 100 people in the US and Canada who run tenders, job budgets, site crews, procurement and milestone billing and want job costs visible while the work is still running. The Odoo Construction package connects quotations, job budgets, site schedules, procurement, labour and milestone billing, and Core is proposed at 18 to 22 weeks and Growth at 22 to 28 weeks. The discovery call is free, and Flectic then sends a written proposal with a fixed price for each phase before work starts. Book a free discovery call.

Sources

  1. QuickBooks Online Plus in the US lists at USD 140 per month and is shown at USD 70 per month for the first 3 months. The plan includes 5 users plus 2 accountants and track project profitability. Advanced lists at USD 340 per month and is shown at USD 170 for the first 3 months, with 25 users plus 3 accountants, a construction financials solution, and advanced project financials. US paid plans say there is no annual contract and the buyer can cancel anytime. The FAQ says Advanced supports up to 25 users, Desktop Enterprise can scale up to 40 users, and Intuit Enterprise Suite is described for multi-entity heavy project costing with no Suite price on the page.

    quickbooks.intuit.comChecked 2026-11
  2. QuickBooks Online Canada shows Plus at CAD 110 per month before a 90 percent off for 6 months promotion shown as CAD 11 per month, with up to 5 users, project profitability, and up to 40 classes and locations. Advanced shows CAD 220 per month before the same promotion shown as CAD 22 per month, with up to 25 users and unlimited classes and locations.

    quickbooks.intuit.comChecked 2026-11
  3. QuickBooks Desktop Enterprise Gold and Platinum are shown starting at USD 38 per month struck through to USD 19 per month on an annual subscription. Diamond is shown starting at USD 19 per month on a monthly subscription. Gold and Platinum are sold for 1 to 30 users. Diamond supports up to 40 users and is only available on a monthly payment plan. Cloud hosting is extra. The page does not publish a separate Contractor Edition price.

    quickbooks.intuit.comChecked 2026-11
  4. QuickBooks Desktop Enterprise Contractor is an industry edition with the same key features as standard Enterprise plus additional reports and a chart of accounts tailored to construction.

    quickbooks.intuit.comChecked 2026-11
  5. The QuickBooks Desktop Enterprise job-costing page lists change-order management, a committed-costs-by-job report, a work-in-progress report, and employee time tracking.

    quickbooks.intuit.comChecked 2026-11
  6. FOUNDATION says pricing is custom by the modules a contractor needs. Included modules include job costing, payroll, purchase orders and subcontracts, and accounts receivable. Named add-ons include mobile time tracking, service dispatch, equipment management, and project management. No dollar price is published.

    foundationsoft.comChecked 2026-11
  7. FOUNDATION job costing lets a contractor build budgets with custom cost codes or CSI divisions, compare estimated versus actual cost, hours, and quantities, and track change orders by status so an approved change updates budget detail without altering the original contract amount. The page describes WIP and over/under billing reports.

    foundationsoft.comChecked 2026-11
  8. Sage 100 Contractor's US product page describes job cost and project detail, customizable dashboards, integrated estimating that can export budgets, proposals, subcontracts, and purchase orders, and names certified payroll, AIA billings, and lien waivers. The page publishes no price.

    sage.comChecked 2026-11
  9. Acumatica Construction Edition is priced on consumption of applications, transaction volume, and computing resources, and supports budgets, commitments, change orders, and progress billing. APEX for Construction bundles software, implementation, and support with a starting price under USD 1,500.

    acumatica.comChecked 2026-11
  10. Dynamics 365 Business Central Essentials lists at USD 80 per user per month, Premium at USD 110, and Team Members at USD 8, paid yearly. Prices shown may differ from checkout because of currency, country, and region.

    microsoft.comChecked 2026-11
  11. In Canada, Business Central Essentials lists at CAD 108.50 per user per month, Premium at CAD 149.20, and Team Members at CAD 10.90, paid yearly, plus applicable tax.

    microsoft.comChecked 2026-11
  12. Business Central project management covers project budgets versus actual item and resource usage, time sheets, purchase of supplies on purchase orders, WIP so expenses can be posted before invoicing, and invoicing when the project finishes or on a schedule. The overview does not describe construction retainage, holdback, or AIA billing.

    learn.microsoft.comChecked 2026-11
  13. Business Central ships five WIP methods (Cost Value, Cost of Sales, Sales Value, Percentage of Completion, Completed Contract). Percentage of Completion uses actual total cost divided by budget total cost.

    learn.microsoft.comChecked 2026-11
  14. WIP is calculated with the Project Calculate WIP batch job, which does not post to the general ledger. A separate Post WIP to G/L batch job posts it.

    learn.microsoft.comChecked 2026-11
  15. Odoo lists Standard at USD 24.90 per user per month for the first 12 months on the initial users ordered, then USD 31.10, and Custom from USD 49.00 (US view). Hosting on Odoo.sh is not included. No CAD price is shown.

    odoo.comChecked 2026-11
  16. Odoo's general-contractor page says the construction toolkit tracks supplier costs against estimates, compares estimated and actual hours, supports progress increments for billing, and manages main contracts and variations. It does not publish a construction-specific license price.

    odoo.comChecked 2026-11
  17. Odoo project profitability reads timesheets, purchase orders, stock-move materials, and invoices, and purchase order costs appear only once the vendor bill is posted.

    odoo.comChecked 2026-10
  18. Odoo analytic plans group accounts by project or department, and analytic distribution is set on each invoice or bill.

    odoo.comChecked 2026-10
  19. Odoo supports percentage and fixed-amount down payments on sales orders, and milestone invoicing updates the delivered quantity when a milestone is reached.

    odoo.comChecked 2026-10
  20. Procore charges an upfront annual fee by product based on annual construction volume, with unlimited users, and its pricing page lists no accounting product.

    procore.comChecked 2026-10
  21. Ontario's Construction Act defines holdback as 10 percent of the value of the services or materials supplied under a contract or subcontract. Prompt payment is subject to that holdback. Section 6.4 requires an owner to pay a proper invoice no later than 28 days after receipt unless a notice of non-payment is given within 14 days. Section 6.1 defines a proper invoice.

    ontario.caChecked 2026-11
  22. For US federal fixed-price construction contracts, FAR 52.232-5 says that if satisfactory progress has not been made, the contracting officer may retain a maximum of 10 percent of the progress payment until satisfactory progress is achieved.

    acquisition.govChecked 2026-11
  23. FAR 52.232-27 sets a 14-day due date for approved progress-payment requests on federal construction contracts and requires the prime to pay subcontractors for satisfactory performance no later than 7 days after the prime is paid. A subcontract may retain a specified percentage if the parties agree.

    acquisition.govChecked 2026-11
  24. The CRA says GST/HST follows the place of supply, including 13 percent HST for goods delivered in Ontario, 14 percent HST in Nova Scotia after 1 April 2025, and 5 percent GST plus Manitoba 7 percent PST when goods are picked up in Manitoba. GST/HST is reported for the period that covers the invoice date whether or not the customer has paid.

    canada.caChecked 2026-11
  25. The 1099-NEC reporting threshold is USD 2,000 for payments made in 2026, adjusted for inflation from 2027.

    irs.govChecked 2026-10
  26. Covered contractors and subcontractors must submit payroll information weekly. Use of Form WH-347 is optional. Certified payrolls are due within 7 days after the regular payment date of the payroll period. The prime contractor is responsible for subcontractors' certified payrolls.

    dol.govChecked 2026-10
  27. Covered contractors and subcontractors submit certified payrolls within 7 days after the regular payment date of the payroll period.

    law.cornell.eduChecked 2026-10
  28. The prime contractor is responsible for the submission of certified payrolls by all subcontractors.

    law.cornell.eduChecked 2026-10
  29. Odoo milestone invoicing updates the delivered quantity when a milestone is reached, and you create the invoice for that share.

    odoo.comChecked 2026-10

Frequently asked questions

What is the best construction accounting software for a contractor of 20 to 100 people?

For that size, start with the user cap and the job-cost reports, not a universal ranking. QuickBooks Online Advanced lists at USD 340 a month in the US and CAD 220 a month in Canada as of November 2026, for up to 25 users. Sage 100 Contractor and FOUNDATION are built for contractor billing and payroll and publish no price, so they are by quote. Business Central or Odoo is the step when you also need purchasing and a full ledger beyond those caps.

What is the best construction job cost accounting software?

Job costing software has to show cost codes, committed cost, cost to complete, and change orders on an open job. QuickBooks Desktop Enterprise lists a committed-costs-by-job report, change-order management, and a WIP report. FOUNDATION budgets by cost code or CSI division and tracks change orders without wiping the original contract. Acumatica names commitments and change orders. Online Advanced names construction financials and does not itemize a committed-cost report on the pricing page.

Which construction accounting software fits a contractor that has outgrown QuickBooks?

Outgrowing QuickBooks usually means you passed 25 Online users, you need more than 40 on Desktop Diamond, or you need retainage, AIA billing, and subcontracts that Online does not itemize. Desktop Enterprise Contractor is the in-family step up to 40 users, with a promotional starting price of USD 19 a month and hosting extra. After that, compare Sage 100 Contractor, FOUNDATION, Acumatica, Business Central, and Odoo on the November 2026 shortlist.

What is included in QuickBooks Online Advanced construction financials, and what still needs Desktop Enterprise?

The US pricing page includes a construction financials solution and advanced project financials on Advanced, with 25 users plus 3 accountants at USD 340 a month before the three-month promotion. It does not spell out retainage, AIA forms, or committed cost. Desktop Enterprise Contractor adds construction reports and a chart of accounts, and the job-costing page lists change orders, a committed-costs-by-job report, a WIP report, and employee time tracking. Diamond reaches 40 users on a monthly plan.

How do I track committed costs and change orders on a job?

Committed cost is posted cost plus open purchase orders and subcontracts that are not billed yet. A change order should revise the budget or the contract and leave the original contract amount visible. On a job with USD 850,000 posted and USD 400,000 still open, committed cost is USD 1,250,000 before you estimate what is left to finish. Desktop Enterprise, FOUNDATION, and Acumatica each document pieces of that workflow. Ask any other vendor to post both numbers on your job during the demo.

What is the difference between US retainage and Ontario holdback?

Ontario's Construction Act defines holdback as 10 percent of the value of services or materials supplied, and prompt payment is subject to that holdback. An owner pays a proper invoice within 28 days unless a notice of non-payment goes out within 14 days. US private-work retainage is set by the contract and state law. On federal fixed-price construction, FAR 52.232-5 allows a maximum of 10 percent retainage when progress is not satisfactory. That federal ceiling is not a nationwide private-work rate.

Does an owner in Ontario have to pay a proper invoice in 28 days if holdback is still owed?

The owner pays the amount payable under a proper invoice no later than 28 days after receiving it, and prompt payment is subject to holdback. Holdback stays withheld under Part IV while the remainder of a proper invoice follows the 28-day rule, unless the owner issues a notice of non-payment within 14 days that states the unpaid amount and the reasons. A proper invoice needs the contractor identity, date, period or milestone, contract reference, description and quantity, amount and terms, and where to pay. These rules are Ontario's. They are not a Canada-wide setting.

Which GST/HST rate applies when a contractor supplies work in another province?

The CRA says the rate follows the place of supply, and tax is reported for the period that covers the invoice date whether or not the customer has paid. CRA examples include 13 percent HST for goods delivered in Ontario, 14 percent HST in Nova Scotia after 1 April 2025, and 5 percent GST plus Manitoba's 7 percent PST when goods are picked up in Manitoba. Construction software should allow the tax code to follow the place of supply on the job. Confirm with your accountant how the holdback portion is taxed, then test that code in the product.

When should a 20 to 100 person contractor move from construction accounting software to an ERP?

Move when the accounting product cannot hold the user count or the documents, and the company also needs purchasing, inventory, or multi-entity finance on the same ledger. Business Central includes project budgets, purchase orders, time sheets, and WIP, at USD 80 or CAD 108.50 per user a month for Essentials, and construction retainage or AIA billing is an add-on. Odoo prices Standard at USD 24.90 per user a month in the first year and USD 31.10 after that, and covers variations and estimate versus actual in the construction app, with implementation separate. Stay on a specialist if that product already produces your WIP and owner bills.

What is the best accounting software for home builders?

Treat each house as a job. You need a budget by cost code, change orders that keep the original contract, and a draw or progress bill the lender accepts. A builder with few users and simple draws can use QuickBooks Online project tracking inside the 5-user or 25-user cap. A builder managing subcontracts, committed cost, and retainage on every house belongs on the same shortlist as a general contractor: Sage 100 Contractor, FOUNDATION, Acumatica, Business Central, or Odoo.